Product Introduction
Composition Composed of hydroxyl resin, weathering pigment, solvent, and curing agent, etc., divided into A. B, two-component packaging,
B, two-component packaging.
Characteristics The paint film has excellent weather resistance, excellent adhesion, high hardness, good flexibility, good abrasion and dirt resistance.
Good abrasion and antifouling properties
Used in outdoor painting, bridge, vehicle, amusement equipment, transformer, outdoor
Large steel structure, cement building protection, etc.
Painting method Brushing, rolling, spraying are available.
Thinner Special thinner for polyurethane paint
Drying time 23±2℃ surface drying ≤ 0.5 hours, drying ≤ 24 hours, fully cured for 7 days.
Application period 23±2℃ 6 hours
Storage period 12 months
Surface treatment The substrate should be strictly treated, remove oil and rust, and apply the primer with good adhesion and anticorrosion effect.
matching.
Precautions 1, the ring polyurethane anti-corrosion coating needs to be dried at room temperature for at least 7 days before it is put into use.
2, rain, fog, snow days can not be open construction (humidity ≥ 75% is not recommended for construction)
B, two-component packaging.
Characteristics The paint film has excellent weather resistance, excellent adhesion, high hardness, good flexibility, good abrasion and dirt resistance.
Good abrasion and antifouling properties
Used in outdoor painting, bridge, vehicle, amusement equipment, transformer, outdoor
Large steel structure, cement building protection, etc.
Painting method Brushing, rolling, spraying are available.
Thinner Special thinner for polyurethane paint
Drying time 23±2℃ surface drying ≤ 0.5 hours, drying ≤ 24 hours, fully cured for 7 days.
Application period 23±2℃ 6 hours
Storage period 12 months
Surface treatment The substrate should be strictly treated, remove oil and rust, and apply the primer with good adhesion and anticorrosion effect.
matching.
Precautions 1, the ring polyurethane anti-corrosion coating needs to be dried at room temperature for at least 7 days before it is put into use.
2, rain, fog, snow days can not be open construction (humidity ≥ 75% is not recommended for construction)